Commercial solar, battery storage & EV charging — by country
Every market below runs on its own validated dataset: tariffs, export regime, grid reliability, taxes and currency, with a source and confirmation date per value. Pick your country to read the market facts or start the configurator.
Available now
A capacity tariff on the monthly peak, dynamic contracts and injection at market price. Peak shaving and arbitrage lead.
Grid congestion decides: non-firm connections and a battery as capacity buffer instead of a heavier connection.
Self-consumption with surplus sale, and a strong case for solar carports and charging.
Per-kWh billing, 60/40 net-billing up to {{netMetering.capKw}} kW and real outage risk. The battery earns first as backup.
Coming soon
Countries with satellite roof coverage or a local dataset in preparation. Each gets its own market page before the configurator opens.
- Antigua & Barbuda
- Albania
- Argentina
- Austria
- Australia
- Bulgaria
- Brazil
- Bahamas
- Canada
- Switzerland
- Chile
- Colombia
- Czechia
- Germany
- Denmark
- Estonia
- Spain
- Finland
- United Kingdom
- Greece
- Hong Kong SAR China
- Croatia
- Indonesia
- Ireland
- India
- Italy
- Japan
- Lithuania
- Luxembourg
- Latvia
- Morocco
- Monaco
- Macao SAR China
- Malta
- Mexico
- Malaysia
- Norway
- New Zealand
- Peru
- Philippines
- Pakistan
- Poland
- Puerto Rico
- Portugal
- Romania
- Serbia
- Sweden
- Singapore
- Slovenia
- Slovakia
- San Marino
- Thailand
- Taiwan
- United States
- Vatican City
- Vietnam
- South Africa
How a country goes live
Dataset
Seven groups of variables (currency, yield, tariffs, grid, taxes, recycling, permits) are researched from primary sources — regulator gazettes, customs tariffs, grid-operator statistics.
Confidence
Each value gets a confidence level. Open items stay visible as open — a country is not launched with guesses hidden behind defaults.
Market page, then configurator
The market page publishes the facts first. The configurator opens once the dataset is complete and a local partner is in place.
Questions about countries
Which countries can use the configurator today?
Belgium, the Netherlands, France and Ghana. Each has a validated dataset and a local delivery partner.
Why does my country show as coming soon?
Either the roof imagery is available but the tariff and tax dataset is not yet validated, or a local dataset is being built. The market page comes first, the configurator after.
Can I request a country?
Yes — ask for a quote and name the country. Markets are prioritised on demand and on how quickly a primary-source dataset can be assembled.
Does the configurator give the same result as a local installer?
It gives a sized proposal and a twenty-year case study from primary-source data; the local partner confirms it on site before a firm quote.
